XXXIII. TABLE continued, shewing the Price to be charged per Foot Cube, for Fir, or other Timber, used in Measured Work, calculated from 71. 15s. to 101. 5s. per Load (50 feet Cube) prime Cost, including Carting and Sawing. XXXIII. TABLE continued, shewing the Price to be charged per Foot Cube, for Fir, or other Timber, used in Measured Work, calculated from 107. 10s. to 137. per Load (50 feet Cube) prime Cost, including Carting and Sawing. XXXIII. TABLE continued, shewing the Price to be charged per Foot Cube, for Fir, or other Timber, used in Measured Work, calculated from 131. 5s. to 157. 15s. per Load (50 feet Cube) prime Cost, including Carting and Sawing. |