If more than 30 feet deep, add ls. per foot on every 30 feet, for a well of 4 feet 6 diameter in the clear, and so on in proportion for a greater diameter.

d.

0 4 Boring, not exceeding 10 feet

0 4 Exceeding 10 feet, add extra for every 10 feet

Note. To find the number of cubic feet of digging in each foot of depth, multiply the square of the diameter, including brickwork, by .7854 – To find the number of gallons in each foot of depth, multiply the square of the diameter, in the clear, by .7854. and the result by 6. PRICE OF MATERIALS TO BRICKLAYERS, NOT INCLUDING CARRIAGE OR PROPIT.

Materials. Bricks.

£ $. d. Place bricks, per thousand

1 8 0 Stock bricks

1 18 0 Second malm stocks

3 5 0 Best washed ditto

5 0 0 White Suffolk bricks

5 0 0 Malm paviors

2 13 0 Ditto pickings

2 2 0

2 10 0 Paving bricks Windsor fire bricks

5 7 0 Dutch clinkers

3 6 0

Tiles. Pantiles, per thousand

3 18 0 Plaintiles

2 1 0 Paving tiles, 10 inches

10 15 0 Ditto, 12 inches.

13 12 0

Lime. Chalk lime, per hundred

0 10 0 Stone lime

0 13 0

Cement. Roman cement, per bushel

0 2 0 Harwich cement

0 1 6 Sand, Hair, &c. Thames sand, per single load

0 5 0 bushel

0 1 2 Ashes, per bushel

0 0 10

Laths. Double for laths, per load

5 5 0 Vak ditto

6 10 0 Single ditto

? 15 0

Hair, per

BRICKLAYER'S PRICES.

These ces are calculated at 28s. per rod for place bricks, and 388 per rod for stocks: should the price vary, for every shilling per thou sand allow 58. per rod, more or less, as the case may be.

BRICKWORK.

Labour

only. £ s. d 1 7 0 1 18 0 1 7 0

1 18 0

Materials

& Labour. Per rod.

£ 8. d. Place brickwork laid dry in wells, cesspools, &c.

9 0 0 Place brickwork in party-walls, &c.

10 0 0 Grey stock brickwork laid dry

11 0 0 Grey stock brickwork in party and external walls

13 0 0 Ditto to garden walls, worked fair on both sides and jointed

13 10 0 Half place bricks and half stocks

11 17 6 One-third place, two-thirds stocks

12 5 6 Add, if in Roman cement

4 0 0 Adà, for stone lime

0 5 0 Add, for river sand

0 5 0 Add, for circular work, per foot super.

0 0 1 Labour, mortar, and scaffolding to party and external walls, per rod

3 18 0 Ditto to garden walls, jointed on both sides 4 8 0

2 2 0 1 18 0 1 18 0

0 0 0

[merged small][merged small][ocr errors][merged small]

Per foot run.
Red returns, one course a stretcher, the other

a header and closer
Common footlace
Groins done with red or grey stocks
Beaded and quirked quoins
Outside splays.
Inside ditto

0 0 6
0 0 5
0 0 9
0 0 9
0 0 3
0 0 2

0 0 3 0 0 3 0 0 6 0 0 6 0 0 2 0 0 1

[ocr errors]

Materials Labour

& Labour. RUBBED AND GAUGED WORK, SET IN PUTTY.

only S. d. S.

d Per foot super.

3 0

1 2 Straight or circular arches, or facia set in putty

3 3

1 6 Elliptical arches set in putty

1 6

0 6 If circular on the plan, add

3 6

2 0 Brick cornice, set in putty

4 9

3 6 Ditto circular

1 0

0 6 For dentil cornice, add per foot run

4 6

1 6 Bodies of semicircular niches, per fout super.

8 6

3 6 Heads of ditto Old gauged arches taken out, cleaned, and reset,

1 6

10 per foot super. DRAINS (EXCLUSIVE OF DIGGING).

Per foot run.
Nine inch drain, half brick sides, 3 courses high,

1 6

0 3 arched and paved Twelve inch ditto, one brick sides, 4 courses high,

2 6

0 4 arched and paved Fifteen inch ditto, one brick sides, 5 courses high,

3 3 0 51 arched and paved

16

0 3 Nine inch barrel drain, half brick rims

1 9

03 Twelve inch ditto

20

0 5 Fifteen inch ditto

4 0

O 7 Twelve inch ditto, 1 brick rims

4 6

0 83 Fifteen inch ditto

5 3

09 Eighteen inch ditto

5 9

0 11 Twenty-four inch ditto

8 0

1 2 Thirty'inch ditto

BRICK NOGGING,
Per yard super.

3 6 0 7 Place bricks laid flat

2 6 06 Ditto on edge

4 0 0 7 Stocks laid Hat

3 0

0 6 Stocks on edge

1 0 0 4 If in cement, add on flat

0 3 Ditto

09
on edge
(Quartering to be included.)

PAVING,

Per yard super. Stocks laid Alat in mortar

3 0 07 Ditto on edge

3 9 09 Ditto laid flat in sand

2 8 0.5 Ditto on edge

3 4 06

3 6 05 Paving bricks laid dat in sand Ditto on edge

7 00 6

[merged small][ocr errors]

Materials

& Labour. Paving, continued.

s. d. Paving bricks laid flat in mortar

4 0 Ditto in cement

4 6 Ditto on edge in mortar

8 0 Ditto in cement

90 Malm paviors on edge in sand

4 3 Malm paviors on edge in mortar

4 9 Ditto in cement

5 6 Ditto laid flat in sand

3 3 Ditto in mortar

3 9 Ditto in cement

4 6 Any of above laid herring-bone, add

0 3 Dutch clinkers on edge in sand

13 6 Ditto laid herring-bone

16 Twelve inch tile paving in mortar, per foot super...

08 Ten inch ditto

07

0 8 0 10 1 0 1 3 0 6 09 0 il 0 5 0 7 09 0 I 1 4 I 10 0 1 0 1

POINTING.

Per foot super.

[blocks in formation]

Tuck-joint pointing to new work
Ditto, including scaffolding
Ditto to old work, including raking out the joints,

washing, staining, and scaffolding
Flat-joint pointing in ash mortar
Ditto, including scaffolding
Ditto to chimney shafts
Colouring and drawing to old joints, including

scaffolding and mending

[merged small][merged small][merged small][ocr errors]

GALLEY TILES.

( 3 0 3 0 3

5

Per

Sets, per foot super. Common white tiles

1 10 Best ditto

2 0 Blue and wbite

4 0 Old galley tiles taken down, squared, and reset

07 PLAIN TILING.

square. Plain tiling, on double fir laths

£2 6 0 Ditto, on oak laths

2 8 0 Ditto, ripped, new double fir laths, and retiling with the old tiles

0 0 Ditto mixed with new tiles, allowing 100 new tiles to every square

1 4 0 Ditto with oak laths

1 6 0 Barge, per foot run

0 0 3 Hip-hooks, each

[merged small][merged small][ocr errors]

Plain Tiling, continued.
Hips and ridge, per foot run
Valley
Allowance for eaves 4 in., dripping eaves, 6 in.,

valleys 12 in., and cutting 3 in.

[blocks in formation]

PANTILING.

Per square.

Ripped, new lathed, and tiled, with all old tiles laid dry

0 12 0 Ditto bedded in lime and hair, and pointed outside 0 17 0 New pantiling laid dry to 10 inch gauge

16 0 Ditto bedded in lime and hair

1 10 0 Ditto pointed outside

1 14 0 Ditto pointed inside

1 16 0 Ditto both sides

1 18 0 Glazed pantiling laid dry

2 5 0 Heading, per foot run

0 0 3 Hips and ridges, ditto

0 0 4 Valleys, ditto

0 0 6 Filleting

0 0 is Ditto in cement

0 0 2 Cuttings to splays

0 0 2 Beam filling ditto

0 0 3 Painted T nails

0 0 3 Hip hooks painted, euch

0 1 3

4 6
7 0
3 0
4 6
5 6
6 6
8 0
3 0
0 1 }
0 1}
02
0 1
0 ]
0 1
0
0 0
0 3

SUNDRIES.

[blocks in formation]

Pulling down old brickwork, including cleaning

and stacking of bricks, per rod Concrete to foundations, one part lime to six of

gravel, exclusive of digging, per yard cube Cutting chase and pargetting, per foot super

ficial
Cuttings to ramps, per foot super.
Ditto to 4 inch splays, per foot run
Bird's mouth splays, per foot run
Points to groined arches
Sash and door frames, bedded and pointed, each
Large and Venetian ditto
Composition, chimney mould, and setting in

cement, 1 foot 6 inches high
Ditto, 1 foot 8 inches
Ditto, 1 foot 10 inches
Red chimney pot, first size
Ditto, second size
Ditto, third size

0 0 6
0 0 4
0 0
0 0
0 0
0 1
0 2 6

1 0 2 0

[merged small][ocr errors]
« EelmineJätka »