Page images
PDF
EPUB
[blocks in formation]
[blocks in formation]

TABLES.

Page.

TABLE 1. Daily plant temperatures, conventional stills, Avon refinery.......
2. Results of Engler distillations of condensate from each vapor line
in crude battery 2 of Avon refinery, January 29, 1916.....
3. Detailed costs of two crude batteries at Avon refinery....
4. Furnace and stack temperatures, with heat losses and furnace
efficiencies, conventional crude stills....

7

8

11

12

5. Average residuum and crude-oil temperatures in the heat exchangers
of conventional crude stills during November, 1916......

14

6. Quality of crude oil refined and of fuel consumed in crude stills and
pipe retorts, Avon refinery, 1916....

28

7. Barrels of distillate run and products made in steam and combus-
tion stills, Avon refinery, 1916....

8. Cost of constructing Bell topping plant, Avon refinery......

9. Results of analyses of flue gas in Bell topping plant, Avon refinery.
10. Data regarding furnace and stack temperatures in Bell topping
plant, Avon refinery......

[ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

11. Cost of refinery operation and repairs, I. W. Fuqua plant..
12. Record of plant operation, I. W. Fuqua topping plant..............
13. Record of temperatures of water discharge of condenser boxes...
14. Records covering rate of heat transfer in jacketed line heat ex-
changers, I. W. Fuqua topping plant....................

15. Fuel required to top oils of various water contents, I. W. Fuqua
plant.

16. Three months' record of crude run and products made in 1912 at
Avila plant..........

17. Three months' record of heat exchangers, Avila plant, 1912....
18. Three months' record of distillate made and cooling water used in
1912, Avila plant....

[ocr errors][merged small][merged small][merged small][merged small][merged small]

19. Record of plant operation, 1917, Prutzman topping plant..
20. Record of operation of Fellows topping plant.......

88

91

21. Products and fuel consumption at the Vernon refinery.
22. Record of heat exchangers, Vernon refinery...

103

108

23. Operating costs of the Vernon topping plant, November and De-
cember, 1913, and January, 1914................

103

24. Comparison of plant temperatures for months of July (to 18th) and
August (to 29th), coolings, Trumble plant....

118

25. Record of operation of Trumble plant at Coalinga during four months
of 1916.......

121

26. Results of laboratory and of refinery distillations, Trumble refinery
at Coalinga.....

122

27. Plant temperatures at Trumble plant, Coalinga......

122

28. Record of heat exchangers, Trumble topping plant at Coalinga..
29. Record of one month's run, Trumble plants 1 and 2, Martinez.
30. Data on heaters at Trumble plant No. 2, Martinez, Cal...

125

148

152

31. Summary of topping-plant records showing fuel consumption and
products made...

153

VIII

« EelmineJätka »